Once poured, the concrete is consolidated to remove air pockets and achieve proper compaction. Finishing touches are applied to the surface, and the concrete is allowed to cure before being protected and sealed for durability.
Let the concrete blocks cure in the moulds for the recommended time, typically 24 to 48 hours. This allows the concrete to harden and gain strength.
Following these steps ensures that your poured concrete blocks are properly mixed, poured, cured, and finished, resulting in durable and high-quality blocks ready for use in various construction projects.